By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sign In
Latest World News UpdateLatest World News UpdateLatest World News Update
Notification Show More
Font ResizerAa
  • Home
  • Business
  • National
  • Entertainment
  • Sports
  • Health
  • Science
  • Tech
  • World
  • Marathi
  • Hindi
  • Gujarati
  • Videos
  • Press Release
    • Press Release
    • Press Release Distribution Packages
  • Live Streaming
  • Legal Talk
Reading: First cable-stayed Anji Rail bridge is ready to start a new era of Indian Railway – World News Network
Share
Latest World News UpdateLatest World News Update
Font ResizerAa
Search
  • Home
  • Business
  • National
  • Entertainment
  • Sports
  • Health
  • Science
  • Tech
  • World
  • Marathi
  • Hindi
  • Gujarati
  • Videos
  • Press Release
    • Press Release
    • Press Release Distribution Packages
  • Live Streaming
  • Legal Talk
Have an existing account? Sign In
Follow US
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Latest World News Update > Blog > National > First cable-stayed Anji Rail bridge is ready to start a new era of Indian Railway – World News Network
National

First cable-stayed Anji Rail bridge is ready to start a new era of Indian Railway – World News Network

worldnewsnetwork
Last updated: January 7, 2025 12:00 am
worldnewsnetwork
Share
6 Min Read
SHARE

Reasi (Jammu and Kashmir) [India], January 7(ANI): The Indian Railways, which is on the path of development, is now moving towards showcasing one more classic example of an engineering marvel with the newly built Anji Rail Bridge.
The country’s first cable-stayed rail bridge is constructed in the Reasi district of the Union territory of Jammu and Kashmir under the most challenging Udampur-Srinagar-Baramulla-Rail Link (USBRL) Project of Indian Railways. The bridge is about 80 km by road from Jammu.
Anji Khad Bridge is the country’s “first cable-stayed bridge” of Indian Railways connecting Katra and Reasi in Jammu and Kashmir. The bridge is a part of the national project of the Udhampur-Srinagar- Baramulla Rail Link (USBRL) Project.
The bridge is located in the young fold mountains of the Himalayas, having extremely complex, fragile and daunting geological features in the form of faults, folds and thrusts, and besides, the seismic proneness of the region. Detailed site-specific investigations were carried out by IIT, Roorkee and IIT, Delhi.
Slopes of the mountain supporting one foundation of the main span have been stabilised by a special hybrid foundation on the Katra end due to space constraints. The major portion of the bridge works, including the main pylon with a 40 m deep hybrid foundation, the central embankment, and the ancillary viaduct, were carried out on the Srinagar end.
Speaking to ANI about the technical details of the bridge, the Chief Administrative Officer (CAO) of the USBRL project, Sandeep Gupta, said, “The total length of the bridge is 725.5 m. This bridge has a single main pylon of height 193 m from the top of the foundation, standing at a height of 331 meters above the riverbed. Considering the ease of construction and typical site conditions, the bridge has been divided into 4 parts. We have built a 120 m long approach viaduct called the “ancillary viaduct” on the Reasi side and a 38 m long approach bridge on the Katra end (CA2).”
“The main bridge, crossing the deep valley, is a 473.25 m cable-stayed portion. The central embankment, which is 94.25 m, is located between the main bridge and an approach ancillary viaduct,” Gupta added.
CAO Gupta further said that it is an asymmetrical cable-stayed bridge balanced on the axis of a central pylon. The total deck width of the bridge is 15 m. The bridge has support of 96 cables having cable lengths varying from 82 m to 295 m. The micro piles of 40-meter depth all around the circumference of the 20-meter hybrid well foundation were used in the Main Pylon construction.
CAO Gupta informed us that the bridge carries a single railway line plus a 3.75 m wide service road; there is a 1.5 m wide footpath on each side of the deck with an overall width of 15 m. It has been designed to handle heavy storms of strong winds. The design wind speed considered is 213 km/h. The design speed of the line is 100 km/h, a limit that does not pose problems for the train-structure interaction.
Gupta informed us that the whole section is ready for operation and after train inspection by the Commissioner of Railway Safety (CRS), we will plan for train operation between Katra and Srinagar.
It is pertinent to note that various unique techniques and equipment are used, like DOKA Jump form shuttering & pump concreting systems, to increase efficiency, provide higher safety for workers and save construction time by about 30 per cent.
A state-of-the-art tower crane imported from Spain with a 40-tonne capacity and an extendable height of up to 205 m is used for enhancing construction activities at heights up to 193 m. The Anji Khad Bridge has an integrated monitoring system using numerous sensors installed at various locations on the bridge.
The work for Detailed Design and Construction Supervision (DDC) of this iconic bridge has been done by the Italian company ITALFERR, a company belonging to the Italian State Railways Group “Ferrovie dello Stato Italiane,” and proof checking was done by the company COWI, UK. The design has been based on Indian codes integrated with Eurocodes, where necessary.
Site-specific earthquake parameters studies were carried out by the Department of Earthquake Engineering, Indian Institute of Technology, Roorkee. Due to the importance of the bridge, a large number of sensors were placed on it to monitor the structural health of the bridge during service.
It is notable that in a significant boost to tourism and connectivity in Jammu and Kashmir, the historic Anji Rail Bridge is a vital link between Katra and the Kashmir Valley. The Anji Khad Rail Bridge is not only an engineering feat but also a vital transportation link, set to revolutionise connectivity and boost economic growth in the region.(ANI)


Disclaimer: This story is auto-generated from a syndicated feed of ANI; only the image & headline may have been reworked by News Services Division of World News Network Inc Ltd and Palghar News and Pune News and World News

sponsored by

WORLD MEDIA NETWORK


PRESS RELEASE DISTRIBUTION

Press releases distribution in 166 countries

EUROPE UK, INDIA, MIDDLE EAST, AFRICA, FRANCE, NETHERLANDS, BELGIUM, ITALY, SPAIN, GERMANY, AUSTRIA, SWITZERLAND, SOUTHEAST ASIA, JAPAN, SOUTH KOREA, GREATER CHINA, VIETNAM, THAILAND, INDONESIA, MALAYSIA, SOUTH AMERICA, RUSSIA, CIS COUNTRIES, AUSTRALIA, NEW ZEALAND AND MORE

Press releases in all languages

ENGLISH, GERMAN, DUTCH, FRENCH, PORTUGUESE, ARABIC, JAPANESE, and KOREAN CHINESE, VIETNAMESE, INDONESIAN, THAI, MALAY, RUSSIAN. ITALIAN, SPANISH AND AFRICAN LANGUAGES

Press releases in Indian Languages

HINDI, MARATHI, GUJARATI, TAMIL, TELUGU, BENGALI, KANNADA, ORIYA, PUNJABI, URDU, MALAYALAM
For more details and packages

Email - support@worldmedianetwork.uk
Website - worldmedianetwork.uk

India Packages

Read More

Europe Packages

Read More

Asia Packages

Read More

Middle East & Africa Packages

Read More

South America Packages

Read More

USA & Canada Packages

Read More

Oceania Packages

Read More

Cis Countries Packages

Read More

World Packages

Read More
sponsored by

You Might Also Like

Congress questions Assam CM’s source of information on allegations against Gaurav Gogoi’s wife – World News Network

“Railway Minister should resign”: Shiv Sena (UBT) leader Anand Dubey on NDLS stampede – World News Network

Uttarakhand: CM Dhami attends workshop organized by NITI Aayog in Dehradun – World News Network

West Bengal Governor CV Ananda Bose visits Prayagraj for Maha Kumbh – World News Network

‘If it is Lt Governor has to do everything, impose President’s Rule’: Delhi AAP president Gopal Rai – World News Network

Share This Article
Facebook Twitter Copy Link Print
Share
Previous Article From Waste to Energy: Gujarat’s Success Story with Biogas – World News Network
Next Article Andhra Pradesh: Infant found abandoned in drain – World News Network
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

- Advertisement -

Latest News

“This film was a special one”: Sidharth Malhotra celebrates 7 years of ‘Aiyaary’ – World News Network
Entertainment February 17, 2025
Sivakarthikeyan’s next with AR Murugadoss titled ‘Madharasi’ – World News Network
Entertainment February 17, 2025
WPL 2025: Renuka, Mandhana shine as RCB ease past DC by eight wickets – World News Network
Sports February 17, 2025
‘Sonic the Hedgehog 3’ gets OTT release date – World News Network
Entertainment February 17, 2025

Sports

RCB unveils key visual paying tribute to relentless passion and loyalty of ’12th Man Army’ – World News Network
Sports
Kane Williamson signs with Middlesex, to represent club in T20 Blast, County Championship – World News Network
Sports

Popular Category

  • Business
  • Entertainment
  • Health
  • Lifestyle
  • National
  • Science
  • Sports
  • Tech
  • Videos
  • World
  • Marathi
  • Hindi
  • Gujarati
  • Press Release
  • Press Release Distribution Packages

Entertainment

Handloom fashion show held at Bharat Tex 2025 – World News Network
Entertainment
Gajraj Rao, Renuka Shahane to be seen in new series ‘Dupahiya’ – World News Network
Entertainment
Latest World News UpdateLatest World News Update
Follow US
Copyright © 2023 World News Network. All Rights Reserved
Welcome Back!

Sign in to your account

Lost your password?